Formula Sheet for Final Exam

   

This is the proposed formula sheet.  Feel free to suggest any additions or changes.  

   

PV of ordinary perpetuity (first payment time 1):   PV0 = C/r

PV of ordinary growing perpetuity:   PV0 = C1/(r-g)

 

1+RREAL = (1+RNOMINAL)/(1+i)

Real CFt = (Nominal CFt)/(1+i)t

 

REVENUES

-       COSTS

-        TAX DEPRECIATION

     EBT

-        TAX

=     NET INCOME

+     TAX DEPRECIATION

-       INCREASE IN WC

    OPERATING CASHFLOW

-        CAPITAL INVESTMENT

=     NET CASHFLOW  

 Cash + New Equity = Investment + dividends  

    PCM

ba = (D/V) bd +  (E/V) be

be= ba  + (D/E) (ba - bd)

            WACC = (D/V) Rd + (E/V) Re = Ra  

 WACC = Ra

 

         REAL WORLD

VL = VU + D*T – PV(COFD)

T = 1 – [(1 - Tpe)(1 - Tc)]/( 1 - Tp)]

      Re = Ra  + (D/E) (Ra - Rd) (1 - T)

WACC = (D/V) Rd (1 - T) + (E/V) Re

  WACC = Ra *[1 – (D/V)*T] 

APV of project = Base case NPV + D*T – PV(COFD) – Issue Costs

 

C =  P0 N(d1) - X e-RT N(d2

d1 = { ln (P0/X) + (R + 0.5 s 2)*T } / { s Ö T} 

d2 = d1 - s Ö T  

 

 

Return to Contents Page